• -

Alternative actions

Despite the injunction on the boatshed project, Alexander and a small group of volunteers have completed a leveling of the big pine blocks that support the keel and now one rib. We dug out the topsoil down to the oystershell level and them backfilled with limerock gravel and created a stable level stiff back for the keel.

Bob and Gordon excavating

 

Pne blocks holding the keel with gravel footings