• -

Finishing stages of the thatched roof

Second side thatch

 

The frond brigade with Alexander nailing

 

With steady volunteer participation, we are closing in on the last bit of thatching  on ther second side of the roof.  There is a lovely shady space in and around the Chalupa Keel and Rib. In addition, we have added bracing to all of the joints between the upright posts and the horizontal roof support structure.

 

Inside view of the thatched peak

 

Green fronds ready to go on the roof

Gordon, the brace meister, at work

 

The roof peak looking toward Hospital Creek